GridLink Energy✓Bay Area corridor · 40 sitesPosted
Grid subsidy fraud costs operators millions in phantom installs. Each of 40 charger sites must be ground-verified: a hunter captures a short attested video showing the powered unit, sensor-locked to the site coordinate and a post-energization slot. The ZK proof publishes only a boolean match - never the hunter's identity or device fingerprint.
subsidyanti-fraudvideo
Verification criteria
A proof settles only if it satisfies every condition below. The verifier program enforces them without exception.
Geofence
37.44190, -122.14300
within ±15m
Capture window
Jun 10 → Jun 20
bound to slot range
Action type
Attested video
device: secure-enclave
Proof target
40 distinct proofs
3 verified so far
Required attestations
Secure Enclave
GPS Lock
Sensor Fusion